Skip to content
Custom apparel manufacturingCA WearsSialkot, Pakistan
WearsStart an RFQ
Menu

How it works / 15 stages in seven phases

From brief.
To release.

Follow the route from raw material and product development through construction, quality control, packing and dispatching. The operations used depend on the garment, material and approved specification.

Process system15 stages / 07 phases
  1. 01Materials & inspection
  2. 02Design, pattern & cutting
  3. 03Sublimation
  4. 04Decoration & laser cutting
  5. 05Bonding & stitching
  6. 06Quality control
  7. 07Finish, pack & dispatch

Commercial terms are confirmed per brief.

Starting pointRaw material
Production route15 connected stages
Process view07 production phases
Closing pointDispatching

01 / Production logic

Three parts of every phase.

Input, production work and a clear handoff connect the route from start to finish.

01

Start with the input

Each phase begins with the material, component or product direction prepared by the previous stage.

02

Complete the work

Specialist teams carry out the production activities assigned to that phase.

03

Move to the next phase

The finished output becomes the starting point for the next production group.

02 / Interactive process guide

Open a grouped phase.

Select a phase to see its production stages, starting point and handoff.

Group 01 / 07Stages 01–02

Materials & inspection

Raw material enters the production route and fabric inspection prepares it for the stages ahead.

Starts with
Raw material
Covers
Raw material and fabric inspection
Stage outcome
Fabric prepared for production
Next group
Design, pattern & cutting

Stages in this group

  1. 0101 / Raw material
  2. 0202 / Fabric inspection department

Flow at a glance

  1. 01Raw material starts the production sequence.
  2. 02Fabric inspection takes place before development and cutting.

15 production stages grouped into seven connected phases.

03 / Start from reality

Start with what exists.

Unknowns become development questions, not guesses.

03

Existing product to improve

Current product and prioritized fit, material or construction changes.

Start this route

04 / Change control

Keep every handoff on the right revision.

Use the current specification, consolidated sample feedback and a recorded approval.

01

One current reference

Point every decision to one product and revision.

02

Visible change

A revision shows what changed, why and who acts next.

03

Named approval

Record the person, state, version and date.

04

Controlled exception

Unresolved dependencies never become silent instructions.

Next / Product brief

Start with what you have.

Bring current references and open decisions. Product review sets the route.

Build your RFQ
Start an RFQ