Skip to content
Custom apparel manufacturingCA WearsSialkot, Pakistan
WearsStart an RFQ
Menu

Factory area / 03

Materials & inspection

Raw material enters the sequence and fabric inspection prepares it for production.

Fabric rolls in the raw-material areaPROCESS / MATERIALSMaterials & inspection production areaMaterial preparation covers raw material handling followed by fabric inspection.
Factory routeArea 03 of 08
Area focusMaterials
Production linkConnected workflow

01 / Area role

What happens here.

Material preparation covers raw material handling followed by fabric inspection.

02 / Key activities

Inside this production area.

The work in this area prepares the product for the next part of the factory route.

  1. 01
    Raw material
  2. 02
    Fabric inspection
  3. 03
    Preparation for the next production stage

03 / Production handoff

Keep the product moving.

01

Receive the brief, materials or components from the previous stage.

02

Complete the activities assigned to this production area.

03

Keep the product direction consistent through the operation.

04

Pass the completed work into the next production stage.

Start an RFQ